INTERCONNECTION LINE BETWEEN 2ND AND 3RD DEPOSIT WITH NEW SOUTHEAST MADRID DEVELOPMENTS. PIPELINE OF WATER SUPPLY.PHASE II.SECTION A
Owner: CANAL DE ISABEL II. COMUNIDAD DE MADRID. (Madrid City Council)
Completion Year: 2008
Construction Budget: US$ 4,6 Millions
Contractor company: ACCIONA-FCC
Relevant details:
Length: 1,400 m
Description: The pipe of 1,400 mm of inner diameter is a concrete pipe steel jacket, with an outer diameter of 1,700 mm.
Alignment: Horizontal radious of 260 m. Slope 2 mm/m.
Hydaulic calculations: Demand calculation, Inital stage: 881,634 l/s. Final stage 1,517,760 l/s. Design pressure: 163 to 185 psi
Services performed:
Detailed design Project.