NEW COLLECTORS OF THE RIVER BANK IN SOUTHERN AREAS OF MADRID. SEWAGE NETWORK AND WASTEWATER TREATMENT.
Owner: DIRECCIÓN GENERAL DE CALIDAD Y EVALUACIÓN AMBIENTAL. (Madrid City Council)
Completion Year: 2008
Construction Budget: US$ 86 Millions
Contractor company: ACCIONA
Relevant details:
Length: 6,400 m
Descripton: Left bank drain system of 510 m long with a hydraulic capacity of 40.00 m³/s, with net width of 4.00 m and a minimum height of 3.80 m. Right bank drain system of 5,890 m long with hydraulic capacity of 80.00 m³/s, with 4.50 m width and a minimum height of 4.50 m
Tanks of discharge of the tributaries drainage systems:
TRIBUTARIES | ||||
Volumen | Length | Width | Height | |
meters3 | meters | meters | meters | |
Drainagesystem-Right Bank | 7,870.00 | 110.00 | 15.00 | 7.43 |
González Feito | 2,944.00 | 46.00 | 8.00 | 11.40 |
Pradolongo | 1,700.00 | 45.00 | 7.00 | 8.60 |
San Martín of la Vega | 520.00 | 20.00 | 5.00 | 7.50 |
La Oliva | 6095.00 | 65.00 | 15.00 | 7.21 |
Services performed:
Detailed design Project.