METROSUR SECTION IX. SECTION: STATION 6 IN GETAFE (THE CASAR) – LEGANES STATION 1
Owner: DIRECCIÓN GENERAL DE INFRAESTRUCTURAS DE TRANSPORTE. COMUNIDAD DE MADRID. (Department of Infrastructures. Madrid State Government)
Completion Year: 2007
Construction Budget: US$ 68 Millions
Contractor company: FERROVIAL-AGROMAN
Relevant details:
Length: 1,996 m
Tunnel: Total lenght of 2 km excavated with TBM-EPB (Earth Pressure Balance). Tunnel inner diameter 8.43 m. Prefabricated reinforced concrete sections of 0.32m width. Ring 7 piece universal type. Excavation diameter: 9.38 m. Fill the gap with mortar.
Casar Station: Station with central platform. Exchanger with Renfe line C-3 on common lobby. Cavern of 215 m long, 15 m of depth and width varies between 13 to 22 m
Espartales Station: Station with two side platforms and upper hall underground. Cavern of retaining walls of 120 m long, 15 m depth and width varying from 18 to 32 m
Services performed:
Detailed design Project.