METROSUR SECTION X-A: LEGANES STATION 1 – STATION EL BERCIAL.
Owner: DIRECCIÓN GENERAL DE INFRAESTRUCTURAS DE TRANSPORTE. COMUNIDAD DE MADRID
(Department of Infrastructures. Madrid State Government)
Completion Year: 2007
Construction Budget: US$ 27 Millions
Contractor company: FERROVIAL-AGROMAN
Relevant details:
Length: 1,543 m
Tunnel: Tunnel excavated with TBM EPB, (Earth Pressure Balance) of 1,020 m long. Inner diameter of 8.43m . Prefabricated reinforced concrete sections of 0.32m width. Ring 7 piece universal type. Excavation diameter: 9.38 m. Fill the gap with mortar
Open tunnel: 254 m long include El Bercial Station. Typical section reinforced concrete frame type of 10 x 8 m
Station El Bercial: Station with two side platforms and lobby at street elevation. The structure consist in perimeter retaining walls, interior columns and roof slabs and background. The set of tracks is conformed by 8 tracks. The total width of the station is 75 m. The length of the railway station is 266 m
Services performed:
Detailed design Project.